5KW preheater: 150T/200T/250T melamine crockery molding machine
7KW preheater: 200T/250T/300T melamine crockery molding machine
10KW preheater: 300T/500T/600T melamine molding machine
1. After installing the electronic tube, turn on the power for more than 10 minutes.
2. Adjust the timer to test for accuracy of timing and check whether the cover is open or not as timer showing.
3. Check the status of cover open and close, whether the equipment work smoothly (visual inspection).
4. The new machine can be put into normal use after the above steps are normal.
Packing with wooden box, seaworthy packing during LCL shipping, or FCL shipping.
1. Preheating the melamine powder can reduce the molding time and improve work efficiency.
2. After the melamine powder is preheated and comes to powder cake, to reduce the rate of shortage powder and also reduce the water waves of the melamine tableware.
3. In theory, UREA can also be preheated. But the characteristics and plasticity of UREA material are higher than melamine powder, few factories use preheating machine for urea powder, but melamine powder requires the preheating machine.
The preheating machine is in a high-frequency and high-pressure work to heat the raw materials, so you cannot use a thermally conductive metal box or a soft plastic box with low strength. The special made plastic preheating box can get a better powder cake after preheating.
1. Adjust the upper regulator according to the height of the powder box. The upper pole plate cannot press the powder box, the distance is about 3mm to 5mm, away from the top of the powder box.
2. If adjusted too low or even press the powder box: it will cause the cover closing abnormally, and the water vapor during baking cannot be exhausted out.
3. If adjusted too high, the baking time will be prolonged, affecting work efficiency.
Reason |
Troubleshooting |
The burned out phosphor bronze sheet on the upper cover will cause the damage (oxidation) of the lower corner copper when closed. It also causes frequent cover jumps and accelerated aging and damage of the tube. |
Replace the damaged phosphor bronze in time |
Burning and oxidation of the high-voltage output copper sheet and grid copper sheet will cause frequent cover jumps and accelerate the aging and damage of the electronic tube. |
Replace the high-voltage output copper and grid copper |
Poor quality capacitor can easily cause failure or any trouble for the preheater machine, which increase the running cost. Shunhao suggest purchasing original Genuine capacitors.
Reason |
Troubleshooting |
The blower capacitor is broken: 1.the fan does not work 2.the machine does not work |
Replace the blower capacitor |
The cover motor capacitor is broken: 1.the cover can’t open or close; or open shortly and then again close 2.the motor cannot stop |
Replace the cover motor capacitor |
The other capacitors broken: 1.the cover jumps and the machine cannot work |
Replace the capacitors |
Reason |
Troubleshooting |
The burned out phosphor bronze sheet on the upper cover will cause the damage (oxidation) of the lower corner copper when closed. It also causes frequent cover jumps and accelerated aging and damage of the tube.
|
Replace the damaged phosphor bronze in time |
Burning and oxidation of the high-voltage output copper sheet and grid copper sheet will cause frequent cover jumps and accelerate the aging and damage of the electronic tube.
|
Replace the high-voltage output copper and grid copper |
Reason |
Troubleshooting |
The transformer wire is not tighten well, so the wire end is burned out at high temperature during work
|
Tighten all thread terminals |
Diode breakdown, which may cause the phase transformer to burn out.
|
Replace the diode |
Too much dust on the transformer causes poor heat dissipation, then the transformer will burn out when the temperature rising
|
Regularly clean up the internal and external of machine |
Tube Maintenance:
1. Make sure the fan can cool the electronic tube
2. Clean up the foreign objects on the dust-proof net on the fan outlet
3. Clean up the foreign objects at the tube cooling copper net